Our power plants
Skjerva power plant is located in Meldal municipality in Trøndelag. The power plant will have an annual production of approximately 8.2 GWh. This corresponds to the consumption of approximately 400 households. Construction of the power plant started in 2018, it produced power for the first time in July 2021, and we have since conducted testing and trial operation until January 2022.
Sleveåne Power Plant is located in Odda in Vestland. With a head of 742 metres, the power plant has an annual production of 17 GWh, equivalent to the electricity consumption of around 750 households. The power plant has been in operation since 2017.
Søråni power plant is located in Bygland municipality in Agder. By utilizing a head of 287 meters, the power plant has an annual production of 19.9 GWh. The power plant has been in operation since 2019.
Storedalen hydropower plant is located in Fjaler municipality in Vestland. The hydropower plant utilizes a 240-meter head and has an annual production of 1.8 GWh. The power plant has been in operation since 2002.
Tokagjelet power plant is located in Kvam municipality in Vestland. With an annual production of 75.6 GWh, the power plant can supply approximately 3,700 households with electricity. Construction began in 2018 and was completed in 2022, representing Clemens Kraft's largest single project.
The Trollvikelva power plant is located in Kåfjord municipality in Troms and Finnmark. The power plant has been in operation since 2020.
Tverråna power plant is located in Hjelmeland municipality in Rogaland. Together with Ullestad power plant, it has an annual production of approximately 31 GWh, equivalent to the electricity consumption of around 1,550 households. The power plant has been in operation since 2016.
Ullestad power plant is located in Hjelmeland municipality in Rogaland. Together with Tverråna power plant, the two co-located power plants will produce approximately 31 GWh annually, equivalent to the electricity consumption of around 1,550 households. The power plant has been in operation since 2016.
Væla power plant is located in Tydal municipality in Trøndelag. By utilizing a head of 75 meters, the power plant produces 3.2 GWh annually. The power plant has been in operation since 2014.