Vossedalselvi in Voss

Gross head (m): 550
Pipeline length (m): 3530
Power (MW): 7.5
Production (GWh/year): 20.5

Vossedalselvi power plant is located in Voss Municipality in Vestland. By utilizing a head of 550 meters, the run-of-river power plant has an annual production of 20.5 GWh. The power plant has been in operation since 2017.

The power plant contributes to renewable energy production. At the same time, consideration is given to anadromous salmonids in a national salmon river and adaptation to the landscape.

License Terms

Minimum water flow 1 May – 30 September  (l/s): 150
Minimum water flow  1 October – 30 April (l/s): 20

If the inflow is less than the minimum water flow requirement, the entire inflow must be released past the plant. In such cases, the power plant
must not be in operation. The power plant must at all times be operated according to the inflow; all changes must take place gradually, and typical start/stop operation must not occur.

Contact

Duty phone
90709365

Station manager
Jan Kjøsnes
95189019
jan.kjosnes@clemenskraft.no