Vestre Neset in Lund

Gross head (m): 151
Pipeline length (m): 2185
Power (MW): 1.5
Production (GWh/year): 4.3

Vestre Neset power plant is located in Lund municipality in Rogaland. The run-of-river power plant utilizes a 150-meter head in the Sætraåna River, with an installed capacity of 1.5 MW from a Pelton turbine. Together with Østre and Nedre Neset power plants, the power plant supplies electricity to around 740 households. The outlet flows into the intake reservoir of Nedre Neset power plant. The power plant has been in operation since 2014.

The Norwegian Water Resources and Energy Directorate (NVE) has established minimum water flows for the summer and winter in order to preserve the environment and landscape.

License Terms

Minimum water flow year-round l/s: 40

If the inflow is less than the minimum water flow requirement,
the entire inflow must be released past the power plant. In such cases, the power plant must not be in operation.
The power plant must be operated steadily and in accordance with the inflow. Typical start/stop operation must not occur.