Nordvik in Surnadal

Gross head (m): 375
Pipeline length (m): 2650
Power (MW): 4.3
Production (GWh/year): 13.7

Nordvik power plant is located in Surnadal in Møre og Romsdal. The power plant utilizes a head of 375 metres for an annual production of 13.7 GWh. The power plant has been in operation since 2006.

The Norwegian Water Resources and Energy Directorate (NVE) has established minimum water flows in summer and winter to preserve the environment and landscape.

License Terms

Minimum water flow 1 May – 30 September (l/s): 30
Minimum water flow 1 October – 30 April (l/s): 15

If the inflow to the intakes is less than the minimum water flow, the entire inflow must be released past the intakes. The power plant must be operated continuously, adapted to the inflow. Typical start/stop operation must not occur.

Contact

On-call phone
90709365

Station manager
Håkon Kindsbækken
48361314
hakon.kindsbaekken@clemenskraft.no