Nedre Neset power plant is located in Lund municipality in Rogaland. The run-of-river power plant utilizes a head of 117 metres. Together, Østre, Vestre and Nedre Neset power plants have a combined annual production of approximately 14.8 GWh, equivalent to the electricity consumption of around 740 households. The power plant has been in operation since 2014.
The Norwegian Water Resources and Energy Directorate (NVE) has established minimum water flows during the summer and winter to preserve the environment and landscape.
License Terms
Minimum water flow all year l/s: 80
If the inflow is less than the minimum water flow requirement, the entire inflow shall be released past the power plant. In such cases, the power plant shall not be in operation.
The power plant shall be operated steadily and in accordance with the inflow. Typical start/stop operation shall not occur.
Contact
Managing Director
Rolf Amundsen
91718848
rolf@siram.no
Contact person at Clemens Kraft AS
Managing Director
91544149
knud.norve@clemenskraft.no