Kvernfossen in Leirvik
Kvernfossen power plant is located in Hyllestad municipality in Vestland. The power plant will produce 9.1 GWh per year, equivalent to the electricity consumption of 450 households. Construction began in 2019, and the power plant had its first hour of production delivered to the grid in June 2021. Following a test period, the power plant was inspected and taken over from the construction phase on 25 October.
NVE emphasises that the development of Kvernfossen power plant will contribute to increased production of renewable energy with limited environmental impacts. Kvernfossen power plant will utilise a 26.5-metre head in the Lølandselva river between the intake at 119.5 metres above sea level and the power station at 93 metres above sea level. The approximately 600-metre waterway is planned to be buried along the entire stretch between the north side of the Lølandselva river and county road 63.
License Terms
Minimum water flow throughout the year l/s: 600
If the inflow is less than the minimum water flow requirement, the entire inflow shall be released past the plant. In such cases, the power plant shall not be in operation.
All changes in water flow shall take place gradually, and typical start-up/shutdown operation shall not occur.
Contact
Duty phone
90709365
Station manager
Jan Kjøsnes
95189019
jan.kjosnes@clemenskraft.no