Grytneselva in Nesset
Grytneselva power plant is located in Molde in Møre og Romsdal. The power plant utilizes the elevation drop in the Grytneselva river and has an annual production of 14.1 GWh. In addition, the power plant receives water from Godvikbekken and Breivikbekken, which is transferred to the intake in Grytneselva. The power plant has been in operation since 2016.
The power plant utilizes an elevation drop of approximately 592 meters. Water from Godvikbekken and Breivikbekken is transferred through buried pipes to the intake in Grytneselva. In consideration of biodiversity and the landscape, NVE has stipulated a minimum flow from the intake in Grytneselva of 140 l/s during the period from 1 May to 30 September and 40 l/s for the rest of the year. In Godvikbekken and Breivikbekken, a minimum flow of 10 l/s has been stipulated for the period from 1 May to 30 September.
License Terms
Minimum flow 1 May – 30 September (l/s): 140
Minimum flow 1 October – 30 April (l/s): 40
The minimum flow requirement will depend on inflow. The power plant shall be operated steadily and in line with the inflow.
If the inflow is lower than the minimum flow requirement, the entire inflow shall be released downstream.
NVE considers an annual minimum flow necessary to maintain the life cycle of benthic fauna species. This will also help ensure suitable living conditions for any sporadic occurrence of anadromous salmonids.