Embla in Stranda
The Embla power plant on the Emdalselva river is located in Stranda municipality, Møre and Romsdal. The power plant has an annual production of approximately 15.7 GWh, equivalent to the electricity consumption of around 785 households. The power plant has been in operation since 2012.
The power plant utilizes a 395-metre head over approximately 2 km in the Emdalselva river, which is a tributary of the Embla/Storelva river. Out of consideration for the Emdalselva river as a landscape element and for the biological diversity associated with the river, NVE has established a minimum flow of 350 l/s from 1 May to 30 September and 50 l/s for the rest of the year.
License Terms
Minimum flow 1 May – 30 September (l/s): 350
Minimum flow 1 October – 30 April (l/s): 50
If the inflow at the intake is less than the minimum flow requirement, the entire inflow must be released past the intake and the power plant must not be in operation. The power plant must be operated as steadily as possible and in accordance with the inflow. Typical start/stop operation must not occur.
Contact
On-call telephone
90709365
Plant manager
Gunnar Kindsbækken
91110330
gunnar.kindsbaekken@clemenskraft.no