Dvergfossen Power Plant
Dvergfossen Power Plant is located in Kvinesdal municipality in Agder. By utilizing two Francis turbines, the power plant has an annual production of 31 GWh and will supply 1,560 households with electricity. The power plant has been in operation since August 2022. The official opening was held on September 13, 2023, by the municipality's mayor, Per Sverre Kvinlaug, and landowner Ole Jerdal.
The power station has two Francis turbines in an excavated open pit. The superstructure is located by the downstream section of the facility. The building is placed above the open pit on a slope towards the surrounding terrain, providing good integration with the landscape both in terms of form and materials.
License Terms
Minimum flow rate May 1 – September 30 (l/s): 700
Minimum flow rate October 1 – April 30 (l/s): 500
If the inflow is less than the required minimum flow, the entire inflow shall be released.
The power plant must always operate according to the inflow, all changes shall occur gradually, and typical start/stop operation shall not take place.
The power plant has a bypass valve that ensures water flow in the event of operational failure. The capacity of the bypass valve is 9 m3/s.
The power plant shall facilitate paddling upon further agreement with a representative for organized activities.
Information in English:
Minimum flow rate May 1 – September 30(l/s): 700
Minimum flow rate October 1 – April 30 (l/s): 500
If the inflow is less than the required minimum flow, the entire inflow shall be released.
The power plant must always operate according to the inflow, all changes shall occur gradually, and typical start/stop operation shall not take place.
The power plant has a bypass valve that ensures water flow in the event of operational failure. The capacity of the bypass valve is 9 m³/s.
The power plant shall facilitate paddling upon further agreement with a representative for organized activities.
Information in German:
Minimum flow rate May 1 – September 30 (l/s): 700
Minimum flow rate October 1 – April 30 (l/s): 500
If the inflow is less than the required minimum flow, the entire inflow shall be released.
The power plant must always operate according to the inflow, all changes shall occur gradually, and typical start/stop operation shall not take place.
The power plant has a bypass valve that ensures water flow in the event of operational failure. The capacity of the bypass valve is 9 m³/s.
The power plant shall facilitate paddling upon further agreement with a representative for organized activities.
Contact
On-call telephone
90709365
Station manager
Stig Skjold
90190278
stig.skjold@clemenskraft.no