The Trollvikelva power plant is located in Kåfjord municipality in Troms and Finnmark. The power plant has been in operation since 2020.
The Norwegian Water Resources and Energy Directorate (NVE) has established minimum water flows for the summer and winter to preserve the environment and landscape.
License Terms
Minimum water flow 1 May – 30 September (l/s): 80
Minimum water flow 1 October – 30 April (l/s): 30
If the inflow is less than the minimum water flow requirement, the entire inflow must be released downstream. In such cases, the power plant must not
be in operation. The power plant must always be operated according to the inflow; all changes must take place gradually, and typical start/stop operation must not occur.
Contact
On-call phone
90709365
Production Director
Simon Stokvold
48144611