Sædalen in Vaksdal

Gross head (m): 160
Pipeline length (m): 1100
Power (MW): 4.4
Production (GWh/year): 10

Sædalen hydropower plant is located in Vaksdal municipality in Vestland. By utilizing a head of 160 meters, the power plant has had an annual production of 10 GWh. A Pelton turbine is installed. The power plant has been in operation since 2020.

Extensive work has been carried out on the foundations and casting of the dam, as well as constructing a road to the intake.

License Terms

Minimum water flow throughout the year l/s: 50

If the inflow is less than the minimum water flow requirement, the entire inflow shall be released past the plant. In such cases, the power plant shall not be
in operation. All changes in water flow shall take place gradually, and typical start/stop operation shall not occur.