Reinåa in Meråker

Gross head (m): 355
Pipeline length (m): 2050
Power (MW): 5.3
Production (GWh/year): 13.4

Reinåa power plant is located in Meråker municipality in Trøndelag. By utilizing a head of 355 meters, the power plant will have an annual production of 13.4 GWh, corresponding to the electricity consumption of approximately 600 households. The power plant was commissioned in 2021.

License Terms

Minimum flow 1 May – 30 September (l/s): 140
Minimum flow  1 October – 30 April (l/s): 20

If the inflow is less than the minimum flow requirement, the entire inflow shall be released past the power plant. In such cases, the power plant shall not be in operation. A bypass valve with a capacity of at least 50% of the maximum intake capacity shall be installed. If the water consumption in the power plant is less than the capacity of the bypass valve, the bypass valve shall open to allow the volume of water passing through the turbine in the event of a trip.
The power plant shall at all times be operated according to the inflow, all changes shall take place gradually, and typical start-
/stop operation shall not occur.