Gudåa in Meråker

Gross head (m): 250
Pipeline length (m): 1380
Power (MW): 4.6
Production (GWh/year): 11.2

Gudåa power plant in Meråker Municipality is located in Trøndelag. By utilizing a head of 250 meters, the power plant has an annual production of 11.2 GWh, equivalent to the electricity consumption of 560 households. The power plant has been in operation since 2020.

NVE has emphasized that the development of Gudåa power plant contributes to increased production of renewable energy, with limited effects on the environment and user interests. The power plant utilizes the drop between elevation 355 and elevation 105 in Gudåa. The waterway runs through a tunnel from the intake down to elevation 305. The intake is not accessible by road, and from the tunnel portal the penstock is buried along the existing road down to the power station. To preserve values associated with the aquatic environment and landscape, the requirement for a minimum flow of 170 l/s during the summer season and 85 l/s during the rest of the year in Gudåa is observed. The requirement for a bypass valve is also observed.

License Terms

Minimum flow 1 May – 30 September (l/s): 170
Minimum flow 1 October – 30 April (l/s): 85

If the inflow is less than the minimum flow requirement, the entire inflow shall be released past the plant.
In such cases, the power plant shall not be in operation.
A bypass valve with a capacity of at least 50% of the maximum
discharge capacity shall be installed at the power plant. All changes in water flow shall take place gradually, and typical start-up/shutdown operation shall not occur.