Østre Neset in Lund

Gross head (m): 208
Pipeline length (m): 1350
Power (MW): 1.6
Production (GWh/year): 4.9

Østre Neset power plant is located in Lund municipality in Rogaland. The run-of-river power plant utilizes a 207-metre drop from Ljosvatnet, with an installed capacity of 1.6 MW from a Pelton turbine. Together with Vestre and Nedre Neset power plants, the power plant supplies electricity to around 740 households. The outlet flows into the intake dam of Nedre Neset power plant. The power plant has been in operation since 2014.

The Norwegian Water Resources and Energy Directorate (NVE) has established minimum water flows during the summer and winter to preserve the environment and landscape.

License Terms

Minimum water flow throughout the year l/s: 30

If the inflow is less than the minimum water flow requirement
and the water level in Ljosvatnet is at the lowest permitted level, the entire inflow shall be released past the power plant.
In such cases, the power plant shall not be in operation.
The power plant shall be operated continuously. Typical start/stop operation shall not occur.

Contact

Managing Director
Rolf Amundsen
91718848
rolf@siram.no

Contact person at Clemens Kraft AS
Managing Director
91544149
knud.norve@clemenskraft.no